Industrial Blansol: la empresa líder en suelo radiante
50 aniversario Industrial Blansol   industrial blansol: la empresa líder en suelo radiante
  barbi: la empresa líder en suelo radiante barbi: la empresa líder en suelo radiante
Home |  In the press   |  Company  |  Contact |  Site map   
suelo radiante, pex-al-pex, ppr, multicapa, prosystem, easypress

Info
Info
Info

You are now: Home -> Gladiator -> Assembly sequence of pipes and fittings BARBI GLADIATOR

Assembly sequence of pipes and fittings BARBI GLADIATOR

Assembly sequence
Take the BARBI fitting
required and the GLADIATOR
end joint of the corresponding
diameter.
Assembly sequence
Place the rubber joint at
the end of the thread.
Assembly sequence
Place the ring onto the
pipe ,in such a way that the
extreme point of the greater
diameter of the ring remains
next to the end of the pipe.
Assembly sequence
The pipe has to be calibrated
in the same way as would be
done with a BARBI
Cross-Linked pipe.
Assembly sequence
GLADIATOR pipe is assembled,
once being calibrated on the fitting.
Assembly sequence
With the help of our Barbi
tool, slide the ring down
until the end.
Assembly sequence



NOTE

1. Replace BARBI classical ring with the special BARBI GLADIATOR rings.
2. Add the end joint to avoid corrosions caused by the contact between the aluminium of the pipe and the brass of the fittings.
3. Substitute the classical BARBI cradles , used for cross-linked polyethylene pipes with the special GLADIATOR cradles.
4. Proceed to assembly exactly in the same way as with the traditional BARBI system.